Why order matters
Most rejected permit applications aren't wrong — they're early. A building permit reviewer wants to see a site plan with setbacks and drainage already resolved, not decide them for you. Zoning and environmental sign-off usually has to come before the building department will even open your file.
The typical sequence
- Site plan + setback survey submitted to zoning/community development
- Environmental sign-off if the parcel touches a flood zone, river corridor, or stream buffer
- Building permit application (structural, barrier code)
- Electrical permit (NEC 680 bonding, GFCI) — sometimes separate from the building permit, sometimes combined
- Final inspection, including the pool barrier, before the pool can be filled and used
What we generate for your address
Your report includes an ordered checklist built from the jurisdiction's actual permitting process, not a generic list — each step cites the office and the code section behind it.